How BART transformed maintenance operations with a Locomotive Turntable

How bar transformed maintenance operations with a locomotive turntable

In pursuit of operational excellence, Bay Area Rapid Transit (BART) sought to standardise maintenance practices across all their locations. However, a key challenge arose: there was a gap in one of their railyards where directional changes for railcar movers were limited by space and safety constraints. To address this issue, BART collaborated with Railquip and […]

100 Tonne Capacity Mining Turntable

100 Tonne Mining Turntable

[row] [col span=”3″ span__sm=”12″] Location Pilbara, Australia Architect Calibre Global Builder Tinto Date 2006 [share style=”small”] [/col] [col span=”8″ span__sm=”12″] Rio Tinto’s engineers Calibre Global engaged ATC to design, engineer and manufacture a 6 metre diameter, 100 tonne capacity turntable project for a mine site in the Pilbara. [/col] [/row] [section] Some complexity for our […]